GB Railfreight identified concerns around the longevity and performance of existing scotch blocks under heavy operational use.
On inspection, significant wear and damage was evident, including:

Kildens worked on-site with GB Railfreight and industry partners to assess real-world usage and identify improvement opportunities.
Testing focused on:

A series of controlled tests were carried out using modified scotch blocks fitted with a traction plate to improve adhesion.
Key findings included:
Following modification of the block profile, further testing showed:

Kildens developed an enhanced scotch block design tailored to GB Railfreight’s operational requirements.
Key improvements included:

✔ Improved block durability under load
✔ Eliminated leading edge splitting
✔ Enhanced adhesion in operational conditions
✔ Increased safety during maintenance procedures

Kildens provided operational recommendations to further enhance safety and performance:
Live rail freight depot environment supporting heavy rolling stock operations under real working conditions.

We support rail depots, contractors and infrastructure teams across the UK with safety-critical solutions.